[email protected] + 961 1 581 267/8 | + 961 1 253 000/1
Ashada Group
  • Home
  • About Us
  • Services
  • Projects
  • News
  • Careers
  • Contact Us
HOMEPROJECTS

Electrical Power Substations

Electrical Power Substations
Electrical Power Substations
Electrical Power Substations
Electrical Power Substations
  • images
    Location

    Safra | Lebanon

  • images
    Client

    Electricité du Liban (EDL)

  • images
    Consultant

    EDF

  • images
    Contractor

    Ashada

Project Highlights

Fast track construction of a 2 x 37.5 megawatt gas turbine station in Baalbeck including all infrastructural works, steel, fuel tanks.

Project was executed in a record 8 months from greenfield status to commercial operation.

Also a 66 KV switchyard was constructed and equipment installed and commissioned by Ashada's sister company Energroup s.a.r.l.

A firefighting network was installed to cover all delivery and storage systems and related equipment were housed in a specially designed building. A command building was constructed to house all control equipment. This power plant spearheaded the Lebanese Government effort to raise electrical production while other major production facilities were planned and procured.

Scope of Work

All infrastructure including equipment foundations, control and fire fight buildings, fencing and road works.

Nabatieh Waste Water Treatment Plant
Prev Project

Nabatieh Waste Water Treatment Plant

All Projects

Next Project

Freezone Beirut Port

Freezone Beirut Port
BACK TO
TOP

Ashada.

CONTACT

Get In Touch

  • Tabaris Square, Moutran Bldg. 2nd Floor
  • + 961 1 581 267/8 | + 961 1 253 000/1
  • [email protected]
Get Directions
Copyright © 2022 Ashada. Developed by Webneoo